| Road and lane closures in the W3 area likely to lead to traffic problems  The following roadworks are likely to cause some delays in the Acton area: Lane Closures on North Circular Near Chiswick Roundabout to ResumeWork on improving Gunnersbury Avenue safety to last through to Summer
 
 
        
          |  Friars Place Lane, Acton |  
          |  18 February — 04 April  |  
          |  Delays likely Road closure  |  
          |  Works description: IMGA192353. Replace approximately 400m of 600mm Medium Pressure SteelGas Main with new Plastic main. Including 2 connections and 2 excavations for bond and bolt camera surveys.  |  
          |  Responsibility for works: Cadent  |  
          |  Current status: Advanced planning  |  
          |  Works reference: AZ0071000772458  |  
        
          | 
              
                |  A4000 Horn Lane, Acton |  
                |  15 February — 28 February  |  
                |  Delays likely Lane closure  |  
                |  Works description: IMGA192469 LANE CLOSURE/TM PERMIT ONLY FOR ASSOCIATED WORKS INWESTERNAVENUE  |  
                |  Responsibility for works: Cadent  |  
                |  Current status: Planned work about to start  |  
                |  Works reference: AZ0071000805616  |  |  
          | 
              
                |  A4000 Victoria Road, Acton |  
                |  15 February — 28 February  |  
                |  Delays likely Lane closure  |  
                |  Works description: IMGA192469 ABANDON 93M X 6" CI MAIN AND INSERT 90/125MM PE AND RELAYORTRANSFER SERVICES.  |  
                |  Responsibility for works: Cadent  |  
                |  Current status: Planned work about to start  |  
                |  Works reference: AZ0071000805614  |  |  
        
          | 
              
                |  A4000,A40 Western Avenue, Acton |  
                |  28 January — 29 September  |  
                |  Delays likely Road closure  |  
                |  Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required  |  
                |  Responsibility for works: Transport for London  |  
                |  Current status: Advanced planning  |  
                |  Works reference: YG432329945  |  |  
          | 
              
                |  Westway |  
                |  28 January — 29 September  |  
                |  Delays likely Road closure  |  
                |  Works description: Cycle Super Highway 10 - reconstruction and installation of new cycle way - section 58 required  |  
                |  Responsibility for works: Transport for London  |  
                |  Current status: Advanced planning  |  
                |  Works reference: YG432329946  |  |  
        
          |  A406 Gunnersbury Avenue (North Circular Road) |  
          |  21 January — 19 March  |  
          |  Delays likely Contra-flow  |  
          |  Works description: Phase 1a - 1f Utility works, drainage and re-profiling works.  |  
          |  Responsibility for works: Transport for London  |  
          |  Current status: Planned work about to start  |  
          |  Works reference: YG432343386  |  
        
          | A406 Gunnersbury Avenue (North Circular Road) |  
          | 07 January — 05 March  |  
          | Delays likely Lane closure  |  
          | Works description: Phase 1a - 2c Utility works, drainage and re-profiling works.  |  
          | Responsibility for works: Transport for London  |  
          | Current status: Advanced planning  |  
          | Works reference: YG432343386  |  
        
        February 26, 2019
            
       
  |