Forthcoming Roadworks in Acton

Road and lane closures in the W3 area

Participate

Traffic and Travel in Acton

Sign up for our Acton newsletter

Comment on this story on the

The following roadworks are likely to cause some delays in the Acton area:

Hammersmith Bridge to Close for Four Days
Cars diverted and bus routes shortened for repairs ahead of major refurbishment -Monday 20 August until Thursday 23 August

Nine Month Delay to Gunnersbury Avenue Roadworks
Power Road bridge project lane closures to continue until autumn 2018

Roadworks in Acton

A4000,A4020 High Street, Acton

14 August — 16 August

Delays likely Traffic control (multi-way signals)

Works description: Aplant to provide multi way lights for safe working zone as per attached survey plan. This is associated with BC005OP1W0000000IBUL4VVM

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005OP1W00000IBUL4VVM01

A4020 Uxbridge Road, Acton

14 August — 16 August

Delays likely Traffic control (multi-way signals)

Works description: Aplant to provide multi way lights for safe working zone as per attached survey plan. This is associated with BC005OP1W0000000IBUL4VVM

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005OP1W00000IBUL4VVM02

A406 Gunnersbury Avenue, Ealing

14 August — 15 August

Delays likely Traffic control (two-way signals)

Works description: SEW DESCALE EMERGENCY/REACTIVE

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU026002141DLTW--000002

B4491,A4000 Gunnersbury Lane, Acton

13 August — 15 August

Delays likely Traffic control (two-way signals)

Works description: Non Excavation - 2 way lights to allow for cherry picker to sit in and access telecoms mast to carry out repair works. footpath closure and pedwalk supplied. The cherry Picker will only be for one day which will be 13/08/2018

Responsibility for works: Vodafone

Current status: Planned work about to start

Works reference: NX04188489/POLE/RTS/LB

B4491, A4000 Gunnersbury Lane, Acton

14 August — 16 August

Delays likely Traffic control (multi-way signals)

Works description: Aplant have advised me that they have copied the main lights head for head and there should be no issues with the pedestrian crossing

Responsibility for works: Openreach

Current status: Planned work about to start

Works reference: BC005OP1W0000000IBUL4VVM

A4000,A40 Western Avenue, Acton
16 August — 18 August
Delays likely Lane closure
Works location: Unknown
Works description: Maintenance of Average Speed system
Responsibility for works: Transport for London
Current status: Planned work about to start
Works reference: YG53014000570
B408 Askew Road
16 August — 19 August
Delays likely Traffic control (two-way signals)
Works location: Unknown
Works description: Lay duct and install tee for customer connection.
Responsibility for works: VIRGIN MEDIA
Current status: Planned work about to start
Works reference: NK100/SCLJFI/97394/LSME

 

A4000, A40 Western Avenue, Acton
13 August — 16 August
Delays likely Lane closure
Works description:CARRIAGEWAY RESURFACING AND GULLY REPAIR
Responsibility for works:Transport for London
Current status:Planned work about to start
Works reference:YG430318502
A4000, A40 Western Avenue, Acton
13 August — 16 August
Delays likely Road closure
Works description:Carriageway Resurfacing- Full Road Closure (Westbound) TMAN: N1801703
Responsibility for works:Transport for London
Current status:Advanced planning
Works reference:YG432304422
A4000, A40 Western Avenue, Acton
13 August — 17 August
Delays likely Lane closure
Works description:Access required to Underground BT structure allowing BT Openreach provide multiple customers service - No structural changes. Work being carried out on existing BT Plant between Alliance Rd Concord Rd and Kendal Avenue under agreed in TFL Ref W18-0537 Lane 1 Closure Westbound BT Openreach on site contacts will be Mark Maloret 07740 009 168 and Chris Eley 07740 739 092
Responsibility for works:Openreach
Current status:Planned work about to start
Works reference:BC005CC1W0IBR3PLVCJULY01
A4020 Uxbridge Road, Acton
14 August — 16 August
Delays likely Traffic control (multi-way signals)
Works description:Aplant to provide multi way lights for safe working zone as per attached survey plan. This is associated with BC005OP1W0000000IBUL4VVM
Responsibility for works:Openreach
Current status:Planned work about to start
Works reference:BC005OP1W00000IBUL4VVM02
Pierrepoint Road, Acton
13 August — 08 September
Delays likely Road closure
Works description:Carriageway resurfacing,
Responsibility for works:Ealing
Current status:Planned work about to start
Works reference:DV00665000555
St Andrews Road, Acton
13 August — 18 August
Delays likely Road closure
Works description:new customer water supply 1x25mm MDPE mtrd, works in the footway and inCarriageway. Our intention is to complete the Permanent Reinstatement inthe same phase
Responsibility for works:THAMES WATER
Current status:Planned work about to start
Works reference:MU307000807492140045-001
Westway
13 August — 16 August
Delays likely Lane closure
Works description:Taper for Full Road Closure (westbound) TMAN: N1801703
Responsibility for works:Transport for London
Current status:Advanced planning
Works reference:YG432304428

Rosemont Road, Acton

01 August — 31 October

Delays likely Road closure

Works description: Carriageway resurfacing,

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000560

Lynton Road, Acton

01 August — 31 October

Delays likely Road closure

Works description: Carriageway resurfacing,

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000559

Pierrepoint Road, Acton

01 August — 31 October

Delays likely Road closure

Works description: Carriageway resurfacing,

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000555

B491 Southfield Road, Chiswick

01 August — 31 October

Delays likely Road closure

Works description: Carriageway resurfacing,

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000541

A4000,A40 Western Avenue, Acton

20 July — 19 November

Delays likely Lane closure

Works location: A4000,A40

Works description: EXCAVATE AND RENEW EXSISTING LV CABLES / SERVICES TRANSFER ALL TO NEW MAINS BACKFILL AND REINSTATE

Responsibility for works: SCOTTISH AND SOUTHERN POWER DISTRIBUTION

Current status: Advanced planning

Works reference: LP705S30000466

Friary Road, Acton

14 July — 31 October

Delays likely Road closure

Works description: Carriageway resurfacing, including some areas of carriageway reconstruction.

Responsibility for works: Ealing

Current status: Planned work about to start

Works reference: DV00665000535

Hillcrest Road, Ealing

11 July — 18 September

Delays likely Road closure

Works description: WORKING ON BEHALF OF THAMES WATER TO CARRY OUT MAINS REPLACEMENT WITH DIRECTIONAL DRILLING

Responsibility for works: THAMES WATER

Current status: Planned work about to start

Works reference: MU821H553/MEAS04/I001

Gunnersbury Avenue (North Circular Road)

7 Jun 2017 - 16 Nov 2018

Delays likely Lane Closure

Works description:1 northbound lane closed, one running lane maintained northbound and two southbound. Traffic lanes will be realigned on the carriageway to suit phases of work during demolition of the main bridge. Lanes will first be slewed to the east and then to the west.

Responsibility for works: Transport For London

Current status: Work in progress

 

Info supplied by roadworks.org

August 15, 2018

 

Bookmark and Share